Answer:
1.5 batches take 12.375 hour
Step-by-step explanation:
The first batch takes 10.5 hours, meaning only .5 batches are left. You then take the time that each new full batch takes (4.25) and divide it by 2 as you only need half of one batch. Meaning 0.5 of a batch takes 2.125 hours. You then take the time of the two batches (10.5, and 2.125) and add them, leaving you with 12.625. Meaning 12.375 is the most viable answer.
Answer:
Part a)
Part b)
Part c)
Part d)
Step-by-step explanation:
see the attached figure to better understand the question
we know that
To find the length of the image after a dilation, multiply the length of the pre-image by the scale factor
Part a) we have
The scale factor is 5
The length of the pre-image is 3 cm
therefore
The length of the image AB after dilation is
Part b) we have
The scale factor is 3.7
The length of the pre-image is 3 cm
therefore
The length of the image AB after dilation is
Part c) we have
The scale factor is 1/5
The length of the pre-image is 3 cm
therefore
The length of the image AB after dilation is
Part d) we have
The scale factor is s
The length of the pre-image is 3 cm
therefore
The length of the image AB after dilation is
Step-by-step explanation:
Given:
Now by Pythagoras theorem,
Substituting values,
Hence, value of x is