Answer:
See explaination
Explanation:
2a)
A hacker group hacked into the Bay Area Rapid Transit system, this was done to protest BART’s shut down of wireless communication in some BART stations. Such attacks is done mostly to stand for some situation which happened previously. Hence, we can say it is a form a hacktivism. It was not ethical as it disrupted the system for some time.But this is also a form of protest which is been done by some group of peoples.
2b)
If a foreign government launches a hacking attack, it can be considered a war.
If this type of attack happens then the repercussions may result to the war.
2c)
We gave an analogy between merchants accepting some amount of shoplifting, on the one hand, and merchants and credit card companies accepting some amount of credit card fraud, on the other hand.
THe streght so called can be pointed out as the money is rolling in the market and the business keeps on going.
The weakness can be described as the loss which is being incurred by the company.
Answer: It allows you to locate materials, be aware of your assignments and plan time to get things done.
Hope it helped.
Answer:
The correct answer to the following question will be Option A (Firewall).
Explanation:
- A network or information system of safety that relies on predetermined security rules that monitors and commands outbound traffic of network or it will be configured specifically to allow VPN to enter the network
- This usually creates a firewall between a trustworthy internal network, such as the Internet, and the untrustworthy outside network.
The other solutions like B, C and D are not capable of allowing VPN to traffic to a network. Therefore, the correct answer is Option A.
Answer: True
Explanation:
Yes, the given statement is true that the due to the very low feasibility the IT (Information technology) department are not aware of the hidden backlog that basically contain projects.
The feasibility is the main factor in the IT department as it helps to study whole objective of the project and then also uncover all the strength and weakness of the project so that we can easily go through the details to make the project more efficient and reliable.