Answer: Prayer with focal point
Explanation:
Answer:
Débito o debe Crédito o haber
Préstamo de la cooperativa Efectivo
Gasto de arriendo Cuentas por cobrar
Cuentas por pagar Documentos por cobrar
Gasto de publicidad Capital social
Hipoteca por pagar Ventas
Intereses pagados Bancos (en el caso de cobros a través de bancos)
Bancos (en el caso que deba productos bancarios)
Explanation:
Answer:
3.1 ns ; 1.25 ; 3.097
Explanation:
Given :
IF, 3 ns;
ID, 2.5 ns;
EX, 2 ns;
MEM, 3 ns;
WB, 1.5 ns.
Use 0.1 ns for the pipelineregisterdelay
maximum time required for MEM = 3 ns
Pipeline register delay = 0.1 ns.
Clock cycled time of the pipelined machine= maximum time required + delay
3ns+0.1 ns = 3.1 ns
2.) for stall after every 4 instruction :
CPI of new machine :
(1 + (1 /4)) = 1 + 0.25 = 1.25
3.)
The speedup of pipelined machine over the single-cycle machine is given by :
Average time per instruction of single cycle ÷ average time per instruction of pipelined
Clock time of original machine = 12ns
Ideal CP1 = 1
CPI of new machine = 1.25
Clock period = 3.1 ns
(12 * 1) / (1.25 * 3.1) = 12 / 3.875
= 3.097
D. Speed up will equal the number of stages in the machine
Answer and Explanation:
After inserting the integers "10", "30" and "20" in an AVL tree, It looks like:
This tree is not balanced. So, to balance this tree, we have to follow some steps:
Step 1 :
After following the LR (Left rotation), Tree will look like:
Step 2 :
Now, following the RL (Right rotation), we will get a balanced AVL tree like: