The equation for problem above is:
350.25+12/100*x=800.5
12/100*x=800.5-350.25
12/100*x=450.25
12x=45025
x=45025/12=3752.08
But the question is "at <span>least" $800.50 so the final answer is
</span>

<span>
</span>
Answer:
Cost-plus-fixed-fee pricing
Explanation:
Cost-plus-fixed-fee pricing is when the contractor specifies the expenses of a project and a fixed fee for the services that provides which allows the contractor to earn a profit. In this type of pricing, the overall cost of the project is determined at the end and all the authorized costs are paid to the contractor in full. According to this, the answer is that these contractors use cost-plus-fixed-fee pricing to compensate them for any cost overruns.
Answer:
I think radio networks
Explanation:
why because i never heard them talk about that stuff on the radio sorry if it was wrong
Answer:
The rate charged per hour of labor is 120.
Explanation:
Rate charged per hour of labor is given by:
= Budgeted cost per labor hour + Profit margin
= 660000/10000 + 54
= 120
Therefore, The rate charged per hour of labor is 120.
Answer:
The correct answer is C
Explanation:
NCI stands for the Non-controlling interest which also called as the minority interest, it is defined as the position of ownership where the shareholder owns outstanding shares that is less than 50% and has no control on the decisions.
Under the situation where the active prices for the shares are not acquired by the acquirer states a different value, it is not appropriate to assume the value of the non-controlling shares same as of the controlling shares.