Answer:
Step-by-step explanation:
If a point (x, y) lies on a straight line, coordinates of the point will satisfy the equation.
Slope of a line passing through two points C(4, 5) and D(8, 10),
m = 
m = 
m = 
Equation of the line passing through C(4, 5) and slope m = 
y - y' = m(x - x')
y - 5 = 
y = 
y = 
If point B(4, 0) lies on the line CD,
0 = 
0 = 5
Which is not true.
Therefore, point B doesn't lie on line CD.
Jonah recorded the points his team scored during its last nine basketball
games. The mean number of points scored was 42 and the MAD Was 4.4.
The MAD shows that the scores generally varied greatly from the mean.
The scores were mostly less than
38 (42 -4.4 = 37.6)
greater than
46 (42 + 4.4 = 46.4).
#SPJ1
Hi there,
(18000 miles / 1 hour)(1 hour / 60 minutes)(1 minute / 60 seconds) adds up to <span>18000 miles / 3600 seconds, which then adds up to </span><span>5 miles / 1 second...
</span>
you should get a total of 5 miles per second
I hope I helped :)
Answer:
The answer would be B I think
Step-by-step explanation:
PLs mark me as brainllest
You can add 14 to the 9 to get pith of the problem so you'd be left with |2x+1| = 23 then it comes it quite obvious that X=11 because 2 times 11 plus 1 equals 23