Working in a fast production line requires not only physical strength and quick reflexes but presence of mind. In instances when the operating machine jams, you need to decide quickly to either temporarily pause the production and call an expert to fix the machine to avoid further delays or fix the machine by yourself. The first option is the more sensible one.
Answer:
I can partially help you with the essay
Explanation:
6. 0.2 on the second line of the number line before 1 and 1/5 as a fraction
7. 0.9 on the last line before 1 of the number line and 9/10 as a fraction
8. 0.3 on the third line of the number line before 1 and 3/10 as a fraction
9. 0.7 on the seventh line of the number line before 1 and 7/10 as a fraction
10. 1.0 on number 1 and 1/1 or 10/10
Sorry if it’s confusing but I hope it helps :)
Answer:
it says in your own words not mine so technically i cant help you you need to do it in your own words.
Explanation: