PERT estimate is a measuring strategy that is based on a weighted average. It is used in measuring the uncertainty and risk via three estimates to determine an estimated likelihood for a project's cost or period of completion.
The formula is (O + 4M + P) ÷ 6
Where P is the most pessimistic = 29
M is the most likely = 12
O is the most optimistic = 10
Hence we have (10 + [4*12]+ 29) ÷ 6
= (10 + 48 + 29) ÷ 6
= 87÷6 = 14.5 ≈ 15
Rounded figure is equal to 15.
Hence the final answer to the question is 15
Answer:
b x 5 = 30
Step-by-step explanation:
This is one of the many correct answers. The reason why is because it shows that the variable is correct. And if you didn’t know what the variable was you could just divide 30 / 5.
This would be an increase. You would have one fraction with 46 over 24 and next to it you would have X over 100. Multiply 46 times 100 and then divide that number by 24. This would be an increase of approximately 191.6