1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
ale4655 [162]
2 years ago
6

A construction crew needs to pave a road that is 202 miles long. The crew paves 8 miles of the road each day. The length, L (in

miles), that is left to be paved after d days is given by the following function.
L(d)= 202-8d
Answer the following questions.
a) How many miles of the road does the crew have left to pave after 13 days?
___miles
b) If 138 miles of the road is left to be paved, how many days has the crew been paving the road?
___days
Mathematics
2 answers:
nasty-shy [4]2 years ago
8 0

Answer:

A)98.  B)8

Step-by-step explanation:

A) 8x13=104

202-104=98

B)202-138=64

64/8=8

the crew has been paving the road for 8 days.

Hope this helps.

san4es73 [151]2 years ago
7 0

Answer:

A) 98 miles

B) 8 days

Step-by-step explanation:

You might be interested in
PLEASE HELP ASAP!! WILL GIVE BRAINLIEST
AleksAgata [21]
I believe that it is D, so sorry if it's wrong, I haven't done this in a while.
7 0
2 years ago
Read 2 more answers
PLS HELP ME ASAP ON COMPLETING THE COMBINATION CHART, OR ENOUGH TO ANSWER QUESTION “D”
Kitty [74]
In the table and chart, we have let x represent numbers of Rock CDs and y represent numbers of Rap CDs.

a) The purple dots represent feasible solutions. Their coordinates are listed in the table (for coordinates on the lines) and as a list of points (for points between the lines).

b) The feasible region for total time in hours is shaded blue.

c) The feasible regiion for total cost is shaded red.

d) The overlap of the two regions is shaded purple. The combinations that are feasible are purple dots in that region.

e) The equations used are listed at the left side of the chart. The equations are labeled by color. (≤112 is the cost equation; ≥75 is the hours equation)

ea) The area that is feasible with respect to both constraints is doubly-shaded.

eba) Too much money is spent to the right of the red line.
ebb) Too few hours are used to the left of the blue line.

f) The line for the desired profit is parallel to the "hours" line, but has x-intercept 10 and y-intercept 6. All the points shown except the two on the lower line will give the desired profit.

g) The higher profit line goes through the points (3, 7) and (8, 4). Those two combinations and the points on or near the upper line above y=4 will meet the higher profit requirement.

5 0
3 years ago
How are <1 and <2 related
Stella [2.4K]

Answer:

They are adjacent

Step-by-step explanation:

3 0
3 years ago
What are the x- and y-coordinates of point C, which partitions the directed line segment from A to B into the ratio 5:8? Round t
s2008m [1.1K]

Answer: D) (1.2,-4.7)

Step-by-step explanation:

plug in the end corrdinates like it says in the equation that the problem gives you.

7 0
3 years ago
Read 2 more answers
last month Stephanie spent $57 on 4 allergy shots and 1 office visit .This month she spent $9 after 1 office visit and a refund
Sergeu [11.5K]

Visit $25 allergy shot $8

4a + 1v =57

-2a +1v= 9

I will multiply the second by -1 to cancel v variable (elimination method)

4a +1v =57

2a -1v = - 9

add both

6a. = 48

a= 8

4a= 32

32 + v = 57

v= 25

32+25 = 57

-16 +25=9

6 0
3 years ago
Other questions:
  • a diver is atan elevation of -18 feet relative to sea level. the diver desceends to an undersea cave that is 4 times as far from
    5·1 answer
  • 1/2x-5=10 find and justify each step
    14·2 answers
  • I NEED HELP ASAP PLS
    5·2 answers
  • Si n es un número impar, ¿cuál de las siguientes opciones representa un número par? a) 2n +1 b) n (n + 2) c) n + (n-1) e) 2 (n +
    12·1 answer
  • What is 84% of 300?
    13·1 answer
  • Solve for x<br> 10x - 72<br> 3x - 4
    9·1 answer
  • Help me get these right.
    5·2 answers
  • Graph the line.<br> 2x - 3y = -9
    13·1 answer
  • Work out 1.7^3<br>Please help ​
    15·2 answers
  • The combined mean and variance of falary of 250 workers of city A and B are 560 and 5497
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!