You look at the decimal place next to the hundredth one. In this case, it’s 4 so you round down
18.19 is the answer
FV=PV(1+r)ⁿ
FV=Future Value, or the $2,600 that you want.
PV=Present Value, or the value that you are depositing.
APR: .06
2,600=2,000(1.06)ⁿ
2,600=2120ⁿ
It would take about a year for Nicole to get $2600.
~Hope I helped~
The distance from point Y to the y-axis is 4 units and the distance from point Z to the y-axis is 3 units, then the lelgth of the segment YZ is 4+3=7 units.
If <span>a scale factor is 3, then the length of Y'Z' will be 7·3=21 units.
</span>
P.S. In the added picture you can see trapezoid ABCD that was dilated by a scale factor 3 about the origin. This may help to understand that all linear values after dilation become multiplied by scale factor.
<span> </span>
Answer:
3 hours and 51 minutes
Step-by-step explanation:
Hope this helps!!
Answer:
0.6 (terminating), 0.5, 0.375
Step-by-step explanation:
I would assume you are wanting these in decimal form. In that case, you would have:
2/3 = 0.6 (terminating)
1/2 = 0.5
3/8 = 0.375