1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Black_prince [1.1K]
2 years ago
7

Annie is creating a stencil for her artwork using a coordinate plane. The beginning of the left edge of the stencil falls at (−1

, 2). She wants to align an important detail on the left edge of her stencil at (2, 1). She knows this is 1:2 of the way to where she wants the end of the stencil. Where is the end of the stencil located? a (0, 5) b (8, −1) c (0.5, 1.5) d (1, 1.7)
Mathematics
1 answer:
ludmilkaskok [199]2 years ago
5 0

Answer: 8 -1

Step-by-step explanation:

referring to brainly.com/question/16983018

The given parameters are;

Location of the beginning of the left edge of the stencil = (-1, 2)

Location of the detail = (2, 1)

Ratio of detail distance from beginning to detail to distance from beginning to stencil end = 1:2

Distance from beginning to detail = √((-1 - 2)² +  (2 - 1)²) = √10

Given that the ratio of the length of the detail to the length of the end after the detail is 1:2 therefore;

√10:Length of stencil side = 1:2

Distance from detail to stencil end = 2×√10

Which gives;

Slope of line = tan⁺¹((2 - 1)/(-1 - 2)) = tan⁺¹(-1/3) = -18.435°

x-coordinates of the end of the stencil = 2√10 × cos(-18.435°) + 2 = 8  

y coordinates of the end of the stencil = 2√10 × sin(-18.435°) + 1 = -1  

The coordinates of the end of the stencil = (8, -1)

You might be interested in
Write a word problem whose solution is |-70|=70
devlian [24]
What is the absolute value of -70.

6 0
3 years ago
Suppose that the number of cars manufactured at an automobile plant varies Jointly as the number of workers and the time they wo
12345 [234]

Answer:

It takes 33 hours to produce 66 cars.

Step-by-step explanation:

When dividing 220 workers buy the amount of cars produced the amount of time spent on making 66 cars is 33 hours.

Easier Explaination:

Divide the amount of workers to the cars produced to find out how many hours it takes.

7 0
3 years ago
9) Simplify 2x^5-6^2+4x^4y/2x
KonstantinChe [14]

Answer:

x^4+2x^3y-3x

Step-by-step explanation:

6 0
2 years ago
A circle has a diameter of 22mm. What is its circumference ?
Artist 52 [7]

Answer:

22\pi

Step-by-step explanation:

Circumference = diameter * pi = 22 * pi

7 0
3 years ago
Read 2 more answers
Michael buys a dozen donuts for his friends for $6 what is the unit rate
katovenus [111]

Answer:

6 dollars per dozen

Step-by-step explanation:

This is a fraction equal to

6 dollars ÷ 1 dozen

We want a unit rate where

1 is in the denominator,

so we divide top and bottom by 1

6 dollars ÷ 1

1 dozen ÷ 1

=  

6 dollars

1 dozen

=  

6 dollars

dozen

= 6 dollars per dozen

7 0
3 years ago
Other questions:
  • Alicia had 2/3 of a pound of berries. Alicia let her friend Jennifer eat
    14·2 answers
  • Answer the following prompts with numerical answers only. If necessary, round answers to the nearest tenth of a unit. The diamet
    10·1 answer
  • A cube has an edge if 4 feet. The edge is increasing at a rate of 2 feet per minute. Express the volume of the cube as a functio
    5·1 answer
  • 2. What is the equation of the line parallel to the line whose
    7·1 answer
  • How do I find a Slope for ( 2,2)and (-3,1)
    8·1 answer
  • Round 624.914 to the nearest hundredth.
    5·1 answer
  • Kitchen tiles cost £2.75 each<br> work out the total cost for 62 tiles
    9·2 answers
  • 100% of what number is 61
    8·2 answers
  • Can somebody walk me threw this math question? <br><br> 9\times 1(3)/(5)\times (2)/(3)
    9·2 answers
  • 20 POINTS ANSWER FAST
    5·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!