<h3>Answer: C) none of the equations are identities</h3>
If you plugged theta = 0 into the first equation, then you would have
sin(45) + cos(45) = sin(0) + cos(0)
sqrt(2) = 1
which is a false equation. We don't have an identity here.
The same story happens with the second equation. Plug in theta = 0 and it becomes
cos(60) - sin(60) = cos^2(0) + tan(0)
1/2 - sqrt(3)/2 = 1 + 0
-0.37 = 1
which is false.
Answer:
10
Step-by-step explanation:
is the answer
<h2>mark me as brainlest</h2>
Answer:
-15/4 > -3 3/8
Step-by-step explanation:
I converted -15/4 into a mixed number with a denominator of 8. First, I made it a mixed number (-3 1/4) and then I converted it to eighths (-3 2/8). Compared to -3 3/8, -15/4 is larger.
Q1: The answer is A. pyramid.
A pyramid has one polygon base. A prism has two polygon bases. A cone has one circular base. A cylinder has two circular bases.
Q6: The answer is false.
Surface area of a rectangular prism is:
A = 2(wl + hl + hw)
A1 = 2(4*5 + 6*5 + 6*4) = 2(20+30+24) = 2*74 = 148
A2 = 2(6*4 + 5*4 + 5*6) = 2(24+20+30) = 2*74 = 148
Q7. The answer is A. 6 feet
The volume of rectangular prism is:
V = w * l * h
w = ?
So, just replace the knowing facts:
288 = w * 8 * 6
288 = w * 48
w = 288/48 = 6
Q8: The answer is 216 ft³
The volume of the cube is:
V = a³
Since a = 6, then:
V = 6³ = 216
Answer:
The linear function that discribes the size of the population in function of the t in years is p = 700t - 1,397,300
Step-by-step explanation:
A linear function is defined by a line, so in order to determine the linear function we can use the two points that were given to us to create a line equation and use that as our linear function. The points given to us were (2009; 9000) and (2014; 12500), in this case the year is our value of "x" and the size of the population is our value of "y". The first step is to find the slope of the line which is given by:
m = (y2 - y1)/(x2 - x1)
m = (12500 -9000)/(2014 - 2009) = 3500/5 = 700
Then we can use the slope and the first point to build the equation:
p - 9000 = 700*(t - 2009)
p = 700t - 1406300 + 9000
p = 700t - 1397300