Answer:
The base is reducing at a rate of 3.4cm per min.
Step-by-step explanation:
Let The Height of the Triangle, h
Area of the triangle = A
Area of a Triangle, 
When 



The base is reducing at a rate of 3.4cm per min.
Answer:
2.4 hours
Step-by-step explanation:
Let total work = X
Rate of work done = X ÷ time
Rate of A = X/4
Rate of B = X/6
If they work together, rate is the sum of their individual rates, i.e.
X/4 + X/6
= (3X + 2X)/12 (taking LCM)
=5X/12
Rate = X/time
5X/12 = X/time
time = X÷(5X/12)
time = X × 12/(5X)
time = 2.4 hours
Shortcut:
Product of individual times/sum of individual times
= (4×6)/(4+6)
=24/10
=2.4 hours
Answer:
m-(nx)
Step-by-step explanation:
He starts with <em>m</em> dollars, and every day spends <em>n</em> so you would multiply <em>n</em> and <em>x</em> to figure out how much he spent over how many days.
Answer:the domain is every “x” coordinate and the range is the “y” coordinate
Step-by-step explanation:
If you have to tell whether it’s a function or not, all of the x values in the domain will be different for a function, and 2 or more of the same x value won’t be a function
Answer:
7
Step-by-step explanation: