1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
andrew-mc [135]
2 years ago
7

Question on Pic Thank You!!!

Mathematics
2 answers:
Bess [88]2 years ago
6 0
A) >
B) =
C) >

Hope this helps!!
Also please could I have brainly?!
igor_vitrenko [27]2 years ago
5 0

Answer:

A is >, B is =, C is >

Step-by-step explanation:

B the same because they both have a zero after the 6 ,

C is greater than because 9.4 has a 4 on the tenths place , which 9.07 has a 0 on the tenths place

A is greater than because it has a 7 on tenths place since 7 is greater than 5

You might be interested in
If 7% of Americans is about 22 million, which number below could represent 7% of Americans
Veronika [31]
65 because if it’s 7% then 22 people then ya
6 0
3 years ago
Denisa is saving for a new bicycle. The bicycle cost $89. So far, Denisa has earned $54 babysitting. What percent of the total c
xz_007 [3.2K]
$54/$89 means she has dared 60.6742% or you can round to 60.67%
5 0
2 years ago
Read 2 more answers
Hayden is a manager at a landscaping company. He has two workers to landscape an entire park, Cody and Kaitlyn. Cody can complet
belka [17]
Answer: 3.4 h

Explanation:

1) The basis to solve this kind of problems is that the speed of working together is equal to the sum of the individual speeds.

This is: speed of doing the project together = speed of Cody working alone + speed of Kaitlyin working alone.

2) Speed of Cody

Cody can complete the project in 8 hours => 1 project / 8 h

3) Speed of Kaitlyn

Kaitlyn can complete the project in 6 houres => 1 project / 6 h

4) Speed working together:

1 / 8 + 1 / 6  = [6 + 8] / (6*8  = 14 / 48 = 7 / 24

7/24 is the velocity or working together meaning that they can complete 7 projects in 24 hours.

Then, the time to complete the entire project is the inverse: 24 hours / 7 projects ≈ 3.4 hours / project.Meaning 3.4 hours to complete the project.
7 0
3 years ago
Read 2 more answers
Put the following equation of a line into slope-intercept form, simplifying all fractions. 4y - 4x -32​
MariettaO [177]

Answer:

y=-4x+4x-32

Step-by-step explanation:

3 0
3 years ago
Read 2 more answers
How can you make 100 by adding with the numbers 2653
lora16 [44]
You can’t? I mean like adding 100 at a time or-
7 0
3 years ago
Other questions:
  • 10.<br> 9. Solve the equation (x-2)(x+2) = 0<br> (4F)<br> A. 02,0<br> B. O-2, 2<br> C.O-2<br> D. 2
    14·1 answer
  • Nine times the square root of three divided by three times the square root of three equals
    7·1 answer
  • Solve the inequality.<br> 2(4+2x)≥5x+5<br> A. x≤−2<br> B. x≥−2<br> C. x≤3<br> D. x≥3
    11·2 answers
  • What is the true solution to the equation below?
    5·2 answers
  • What is -8r-8+5 simplyfied
    14·1 answer
  • He access code for a​ car's security system consists of four digits. the first digit cannot be 8 and the last digit must be even
    5·1 answer
  • Find the equivalent expression 3+2(2p+4t)
    10·1 answer
  • A.) What is the measurement of the missing side (c)? <br><br>b.) What is the angle of (x)? ​
    15·1 answer
  • −5(x+2)=−5x+n<br> What is n?
    15·2 answers
  • PLEASE HELP ME ASAP(WORTH 30 POINTS). If the domain is {0, 2, -6}, what is the range of y = -2x + 3?
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!