1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
polet [3.4K]
3 years ago
11

A museum open at 8 a.m. in the first hour 350 people purchase admission tickets in the second hour 20% more people purchase admi

ssion tickets than in the first hour each admission ticket cost $17.50 what was the total amount of money paid for all the tickets purchased in the first 2 hours
Mathematics
1 answer:
CaHeK987 [17]3 years ago
4 0
350*17.50 + 350(1.2)*17.50 = 13475
You might be interested in
Which table of values was used to create the scatterplot below?
fredd [130]

Answer:


Step-by-step explanation:


There is a scatter plot given and we hae to find the tables.

On the x axis, day of fund drive is marked and on y axis money raised is marked.

We find out the points from the graph as Ordered pairs

(1,200) (2,300) (3,200) (4,400) and (5,300)

The above can be represented in table form as

1 2 3 4 5

200 300 200 400 300

With a scatter plot a mark, usually a dot or small circle, represents a single data point. With one mark (point) for every data point a visual distribution of the data can be seen. Depending on how tightly the points cluster together, we can find the relationship between the two variables.

6 0
3 years ago
Read 2 more answers
the waiter places a bowl of soup in front of lacy in a counterclockwise direction she passes the soup 90° the person receiving t
dybincka [34]

haifia is the answer did it on test

5 0
3 years ago
As VP for operations at​ Méndez-Pinero Engineering, you must decide which product​ design, A or​ B, has the higher reliability.
slega [8]

Answer:

Check the explanation

Step-by-step explanation:

The overall reliability of the system provided in design A = 89.13 %

Product design B has higher reliability than design A.

Overall reliability of system provided in design B = 89.85 %.

Kindly check the attached image below to see the step by step explanation to the question above.

4 0
4 years ago
What is the correct answer?
vodka [1.7K]

Answer:

B)  3

Step-by-step explanation:

This is because they are both circles and they each have the same equation for circumference. C=2πr

So that if pi stays x 2   then the perimeter will still be 3 x as big as the smaller circle. Which means it takes 3 full turns as to turn around the perimeter.

7 0
4 years ago
Caiden wants to use the distributive property to find the value of 28⋅19+28⋅6528·19+28·65. Which expression can he use?
MakcuM [25]
28 times 28 times (19+65)

4 0
4 years ago
Other questions:
  • Solve the system of equations. –6x + y = –21 2x − 1 3 y = 7 What is the solution to the system of equations? (3, 3) (2, –9) infi
    7·1 answer
  • If you could help me that would be awesome
    5·1 answer
  • What is <br> 8/9 times 3/16
    5·2 answers
  • Solve the equation 4+2y=9+2y
    8·2 answers
  • Four out of every five teenagers surveyed went to a movie theater in the past month. If 95 teenagers were surveyed, how many had
    11·1 answer
  • What decimal is equivalent 3/15?
    5·1 answer
  • In the expression -12+m-9m+13, name the coefficients​
    15·2 answers
  • Mr Paul bought 2 bags of fertilizer at $75 a bag,a wheelbarrow for $350 and 3 spades at $130 a spade.he paid $1000 to the cashie
    14·2 answers
  • I need help with this
    13·1 answer
  • 6. Two linear equations are shown in the graph.
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!