Answer:
b. the area to the right of 2
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X, which is also the area to the left of Z. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X, which is the area to the right of Z.
In this problem:




Percentage who did better:
P(Z > 2), which is the area to the right of 2.
Answer:. The answer is A. Probability is the numerical measure of the likelihood that an event will occur.
Step-by-step explanation:
Probability is the numerical measure of the likelihood that an event will occur. It is the ratio of the possibility of an event happening to the total number of events.
It is lesser than 100 or 1.
It is usually expressed as a fraction or decimal. The probability of an event not happening is 1 - the probability that the event happening.
This can also be expressed in terms of success or failure.
Thus, the probability of failure = 1 - probability of success
true i think i'm not sure though