Answer:
True
Step-by-step explanation:
A six sigma level has a lower and upper specification limits between
and
. It means that the probability of finding no defects in a process is, considering 12 significant figures, for values symmetrically covered for standard deviations from the mean of a normal distribution:

For those with defects <em>operating at a 6 sigma level, </em>the probability is:

Similarly, for finding <em>no defects</em> in a 5 sigma level, we have:
.
The probability of defects is:

Well, the defects present in a six sigma level and a five sigma level are, respectively:
Then, comparing both fractions, we can confirm that a <em>6 sigma level is markedly different when it comes to the number of defects present:</em>
[1]
[2]
Comparing [1] and [2], a six sigma process has <em>2 defects per billion</em> opportunities, whereas a five sigma process has <em>600 defects per billion</em> opportunities.
U should know the area of rectangle is w*l
if we increase it by double or times 2 its area will be
A=2w*2wl
A=4wl
area would be 4 times of original one
Now u can get the answer
Answer: Area of ΔABC is 2.25x the area of ΔDEF.
Step-by-step explanation: Because equilateral triangle has 3 equal sides, area is calculated as

with a as side of the triangle.
Triangle ABC is 20% bigger than the original, which means its side (a₁) measures, compared to the original:
a₁ = 1.2a
Then, its area is


Triangle DEF is 20% smaller than the original, which means its side is:
a₂ = 0.8a
So, area is


Now, comparing areas:

2.25
<u>The area of ΔABC is </u><u>2.25x</u><u> greater than the area of ΔDEF.</u>
Answer:
11380810
Step-by-step explanation:
hope this helps