A, B and C working together will finish same piece of work in 10 days
A can do a piece of work in 20 days. That is A is doing the work at a rate of 1 / 20. Therefore
B = 1 / 30
C = 1 / 60
A, B and C working togehter their rate will be added together =
A + B + C = 1 / 20 + 1 / 30 + 1 / 60 = 1 / 10
so they can work together to finish same piece of work in 10 days
Answer:
Honestly im not sure
Step-by-step explanation:
5.2°C = (273 + 5.2)k = 278.2k
Change in temperature = 368k -278.2= 89.8k
q (heat energy) = MCp∆T
When Cp of water =1046J
q = 7.59 g × 1046J × 89.8k
= 712, 934.772Jgk-1 = 713kJgk
When Cp of water =250cal
q = 7.59 g × 250 × 89.8k = 170kCalk
Taiga’s teacher asked him to draw a polygon with vertices (–4, –5), (–5, 2), (–5, 3), (–4, 5), (2, 3), and (–3, 0) and to identi
cupoosta [38]
Taiga is not correct because the polygon is a hexagon.(6 sides). Heptagon has 7 sides
Answer:
5,589,000
Step-by-step explanation:
5.589 x 1,000,000=
5,589,000