Answer:
136 
Step-by-step explanation:
Well if you find the lateral area (the area of the rectangles on the sides) to get 112, so you just need to add that to the triangles and for those (they add up to 36) you can just use the formula for the area of a triangle, which is
.
Hope this helps :)
Answer:
9.18% probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated?
This is 1 subtracted by the pvalue of Z when X = 16. So



has a pvalue of 0.9082
1 - 0.9082 = 0.0918
9.18% probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated
The answer to this is true
Answer and Explanation:
The line seems to pass trough the points (0,6) and (-3,4).
Slope is: 

The slope of the line should be
.
B 6hrs 40 minutes
30000 / 75 = 400
400 minutes put into hours is 6 hours 40 minutes