Since, the number w and 0.8 are additive inverses.
A number 'a' is said to have an additive inverse '-a' if "a+ (-a)= 0".
Since, 'w' and '0.8' are additive inverses of each other such that 
Therefore, the value of 'w' should be '-0.8' so that
.
So, the value of 'w' is =0.8
Now, Refer to the attached image which represents the position of 0.8 , w ( that is -0.8) and the sum of 0.8 and w.
Sum of 0.8 and w = 0.8 + w
= 0.8 +(-0.8)
= 0.
Answer:
y = -1/2 ( x − 4 )^2 + 8
Step-by-step explanation:
First find the vertex form
y = a ( x − h )^ 2 + k where ( h,k) is the vertex
The vertex is ( 4,8)
y = a ( x − 4 )^2 + 8
Now we need to determine a
Pick a point on the graph (0,0)
and substitute this point into the equation
0 = a ( 0 − 4 )^2 + 8
0 = a (16) +8
-8 = 16a
-8/16 =a
-1/2
y = -1/2 ( x − 4 )^2 + 8
Answer:
B . Yes
Step-by-step explanation:
Recall: a tangent of a circle is perpendicular to the radius of a circle, forming a right angle at the point of tangency.
Therefore, if segment ST is tangent to circle P, it means that m<T = 90°, and ∆PST is a right triangle.
To know if ∆PST is a right triangle, the side lengths should satisfy the Pythagorean triple rule, which is:
c² = a² + b², where,
c = longest side (hypotenuse) = 37
a = 12
b = 35
Plug in the value
37² = 12² + 35²
1,369 = 1,369 (true)
Therefore we can conclude that ∆PST is a right triangle, this implies that m<T = 90°.
Thus, segment ST is a tangent to circle P.
Answer:
If 2/3 ton of gravel covers 3/4 of a driveway, you need to divide 2/3 divided by 3 to find how much is needed for 1/4 of the driveway. So first step:
1. 2/3 divided by 3 = 2/3 * 1/3. So 2/9.
2. Add 2/3 plus 2/9= 8/9 ton of gravel to cover the whole driveway.
Step-by-step explanation:
Mark me brainliest!