Answer:

Step-by-step explanation:
We are given the following in the question:
Controller cost = $135
System cost = $2.50 per foot of pipeline
The total cost depends upon the length of Pole.
Let the system requires F feet of pipeline.
Total cost will be given by the equation:

is the required expression for total cost
F: feet of pipeline required
c(F): Total cost of installation
Answer:
t to the 2 power
Step-by-step explanation:
Periodt Pooh. For brainly??
Answer:
4
Step-by-step explanation:
Slope=rise over run.
From bottom marked point (-3, -3) to the other (-2, 1)...
Rise= 4
Run= 1
4/1=4
Therefore, the slope is 4.
Hope this helps!! Have an amazing day ❤