DB is a median (given). It goes from vertex point D to midpoint B.
The point B is the midpoint of segment AC. So B cuts AC into two equal halves: AB and AC
Meaning AB = AC
AC = AB+BC ... segment addition postulate
AC = AB+AB ... substitution; replace BC with AB (valid because AB = AC)
AC = 2*AB
2*AB = AC
2*AB = 50 ... substitution; replace AC with 50
2*AB/2 = 50/2 ... divide both sides by 2
AB = 25 which is the answer
Number of pallets moved in 4.5 hours = 108
converting 4.5 hours in minutes we get,
4*60 + 0.5*60 = 240+30 = 270 minutes
So, 108 pallets were moved in = 270 minutes
1 pallet was moved in =
minutes
As the tie will get over in 2 hours or 2*60 = 120 minutes, the number of pallets that can be moved will be =
pallets.
Hence, 48 pallets can be moved before quitting time.
Answer:
(x-8)(x+3)
Step-by-step explanation:
1) Find out what are the factors of the constant?
2) Which of those add to equal the coefficient before the x value?
In this particular equation, we have the constant being 24. The first two factors that come to mind are 6 and 4, and 8 and 3. Since it is -24, we need one of these numbers to be negative.
Let's look at our "b" value, or the coefficient behind the x value, 5. Looking at our factors and thinking of addition (since one of them must be negative, it will most likely be subtraction instead of addition) I can see that
8+ −3=5
which is one of the factors of -24.
This means that we can factor our equation using these numbers, getting us the following:
(x−3)(x+8)
Hope this helped!
Answer there is no choice, but it is x+1/3+2 1/2.
Step-by-step explanation:
Answer:
D
Step-by-step explanation:
IM RLY SORRY IF THIS IS WRONG IM DOING THIS FORM MEMORY
so I'm pretty sure u the arch equals twice the angle
so pi/2*2 = pi so D
hope it helppsss
trying not to dieT-T