1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Gwar [14]
2 years ago
13

I just have one more question what is the answer to this one?

Mathematics
2 answers:
Tomtit [17]2 years ago
4 0

Answer:

82  7/8

Step-by-step explanation:

Volumes is length x width x height

L 8 1/2 x W 3/1

change 8 1/2 mixed fraction to an improper fraction of 17/2

17/2 x  3/1 =  17x3/2x1 = 51/2

Now we times 51/2 x height 3 1/4

change 3 1/4 mixed fraction to an improper fraction 13/4

51/2 x 13/4 =  51x13/2x4 = 663/8

Now they want your answer to be a simplified mixed fraction

How many times can  8 go into 663 without going over?  

82 times since 82 x 8 = 656

The remainder left over is 663/8 - 656/8 = 7/8

So your answer is 82 7/8.  You cannot simplify 7/8 any farther.

You can also divided 663 by 8, just remember to list your remainder as a fraction of the eighths

Nadusha1986 [10]2 years ago
3 0

Answer:

82 7/8 I think

Step-by-step explanation:

You multiply first 8 1/2 and 3 1/4 and then multilpy that answer with 3

You might be interested in
A projectile was launched straight up from the ground with an initial velocity of 48 ft/s. The height of the projectile t second
alex41 [277]
Factor f(t) and you can identify the values of t for which the height is zero.
.. f(t) = -16t(t -3)

The projectile lands after 3 seconds in the air. (selection A)

8 0
3 years ago
I NEED HELP ASAP!!<br><br> 4(5)(-2)=?
vova2212 [387]
So, in an easier way to say it
4 × 5 × -2

You would start by doing 
4 × 5 = 20
Then,
 20 × -2 = 40 

So your answer is -40

Hope I helped ♥
5 0
3 years ago
Your crew can pave two driveways in a day. You work five days per week but take off 2 weeks each year for holidays and vacations
k0ka [10]
According to Philippine Payroll Regulations and Information, there will be a total of 247 working days for all employees working from Mondays to Fridays and considered Saturdays and Sundays as rest days. If the two weeks off is referring to employees working days only, it means employee can file a leave for 14 equivalent days off. Computations will be Total driveways= (247 days-14 days off) * 2 driveways per day and the answer is 466 driveways.
5 0
3 years ago
Please help asap, its due in 20min
mojhsa [17]

Answer:

The scalar factor is 4/3

Step-by-step explanation:

The bottom of triangle B is 16 units, the bottom of triangle A is 12 units. So to find the scalar factor you have to divide B by A:

6/12=4/3

8 0
3 years ago
1) The red graph (1) is the graph of f(x) = 2^x. Describe the transformation of the blue function (2) and write the equation of
liubo4ka [24]

Answer:

nose

Step-by-step explanation:

nosee

6 0
3 years ago
Other questions:
  • Someone help me with this ?
    15·1 answer
  • The low temperature last week in Iceland was-2.25. The low temperature this week was 1.25. What was the change in temperature fr
    5·1 answer
  • What is the point-slope equation of the line with slope -13 that goes through the point (5, 7)?
    9·1 answer
  • Round 739 to the nearest ten and hundred
    8·2 answers
  • Identify the vertex, the axis of symmetry and the y intercept of the parabola below.<br>please.​
    13·2 answers
  • Complete the table.
    6·1 answer
  • Insert 2 sets of parentheses to make each sentence true: 2 x 14 - 9 - 17 - 14 = 7
    14·1 answer
  • Find M Please help!!!! Last question worth 10 points!
    5·1 answer
  • If a greyhound can run up to 50mi/h. How long would it take a greyhound to run 10 mi?
    13·1 answer
  • What expression can be used to determine the cost of the buying and pounds of almonds $4.95 per pound and a half pounds of flour
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!