The answer is "<span>the lie scale".</span>
In psychometrics, articles which are involved in a set of
questions or test which particularly is designed to see and determine whether
those who are taking these tests have answered with the truth to the articles
the questionnaire is designed to tap. p.
Well, I don't know what exactly it taught you, but for me it taught me a list of things:
- how to work cohesively with people with dramatically different ideas than me
- how to appreciate and participate in other cultures
- my actions and the results are dependent on me
- social systems are drastically different and are dependent on your cultural background
- There are universal human wishes and things with which you can bond
- the importance of social support, and the significance of belonging to a community
These are just a couple things I learned from moving cross-culturally throughout my life.
No, 3 hours equals 180 minutes are out of this confidence interval.
<h3>What is confidence interval?</h3>
A confidence interval (CI) is a range of estimates for an unknown parameter in frequentist statistics. The 95% confidence level is the most popular, however other levels, such 90% or 99%, are occasionally used when computing confidence intervals. The percentage of related CIs over the long run that include the parameter's actual value is represented by the confidence level. For instance, 95% of all intervals calculated at the 95% confidence level should include the parameter's actual value. The degree of confidence, the size of the sample, and the sample's variability are all factors that might impact the breadth of the CI.
To know more about confidence interval, visit;
brainly.com/question/24131141?referrer=searchResults
#SPJ4
Answer:
measuring production levels
Explanation:
Economic rational choices refers to a scientific frameworks that a person or a group can use in order to fulfill all of their interests and needs. The means are the things that we can use before we make those rational choices
To make a rational economic choices, there are several steps that generally need to be followed:
Understanding what want to be achieved - analyzing the resources that we possess to achieve it - formulating potential plans - assessing cost and benefit of our action - choosing the best plans.
Measuring production levels is an activity that we do after the plan is already executed. Is not something that we do before we make the choice.