I think
A. convert the time to seconds, so all the time are 7070sec and the total course to meter.
so 31300meter
Vector = TotalCourse÷total time
V=31300/7070=4.427157m/s
convert it to km/h so 4.427157×36÷10=
15.9377km/h
B. 45÷15.9377=2.823Hour
it means that around 2 Hour 48Minutes more.
i think the teacher need to simplify it
Answer:
y = - x - 2
Step-by-step explanation:
y=mx+b
m refers to slope
b refers to y intercept
y = (-1)x + (-2)
y = - x - 2
In a function, the range is the y value or axis. Most points on this graph have a y value of zero, but one has a value of 1.
The correct answers are 0 and 1.
Hope this helps!
Answer:
The correct option is b.
Step-by-step explanation:
To find the number of solutions, we need to solve the equation:

Let's group all the "x" on the equation.
Now, let's solve for "x".
Therefore, the equation has one solution. The correct option is b.
I hope it helps you!