Answer:
48
Step-by-step explanation:
The third one, 2 to the power of 5 over 6
√2 * 3√2
convert from radical form to exponent form to solve for the same root
( x^m/n = n√x^m )
2^(1/2) * 2^(1/3)
2^{3/6} * 2^{2/6} - find common denominator (6)
6√(2^3) * 6√(2^2) - convert back to radical form
6√(2^3 * 2^2)- combine
6<span>√(</span>2^5)
then convert to exponential form again
~ 2^5/6 ~
Answer:
2. 94.0 km/h
Step-by-step explanation:
since the airplane is moving at angle of 54° from the ground, the horizontal component of the velocity is given by cos component
speed of air plane= 160 km/hr
horizontal component of velocity v= 160 cos 54°
= 94.045 km/hr
Thus the truck must travel at an speed of 94.0 Km/hr hence second option is correct.
Answer:
Step-by-step explanation:
Let
n -----> number of tickets
C ----> represent the cost of buy n tickets online
we have the ordered pairs
(1,16.50) and (2,30.50)
<em>Find out the slope of the linear equation</em>
The formula to calculate the slope between two points is equal to
substitute the values
<em>Find the equation of the line in slope intercept form</em>
we have
substitute
substitute
The domain of the function is all positive integers (whole numbers) including zero
{0,1,2,3,4,...}
Answer:
B. load-distance model
Step-by-step explanation:
A. trial and error
Trial and error is "a fundamental method of problem solving. It is characterised by repeated, varied attempts which are continued until success". But this method is not the best in order to compare effectiveness of layouts
B. load-distance model
The load-distance method is a "mathematical model used to evaluate locations based on proximity factors. The objective is to select a location that minimizes the total weighted loads moving into and out of the facility. The distance between two points is expressed by assigning the points to grid coordinates on a map". And that's the correct option since we are trying to measure the effectiveness of layouts quantitatively.
C. exponential smoothing
This is "a rule of thumb technique for smoothing time series data using the exponential window function". Wheighting observations using the exponential function. But this is a techinique used to smooth s time series not to compare effectiveness of layouts.
D.process control charts
The Control Chart is a "graph used to study how a process changes over time with data plotted in time order". But we don't want to see how the process changes the objective is quantitatively compare the effectiveness of layouts, and this one is not the best option for this.
E. mean absolute deviation (MAD)
The median absolute deviation(MAD) is "a robust measure of how spread out a set of data is. The variance and standard deviation are also measures of spread, but they are more affected by extremely high or extremely low values and non normality". But again is just a measure of spread and not allow to compare effectiveness of layouts.