provided net cash of $10,000
Explanation:
The computation of the cash flow from operating activities is shown below:
Cash flow from operating activities
Net loss -$30,000
Add: depreciation expense $20,000
Add: Decrease in account receivable $15,000
Less: Increase in merchandise inventory -$25,000
Add: Increase in account payable $30,000
Net cash flow provided by operating activities is $10,000
The positive sign reflects the inflow of cash while the negative sign reflects the outflow of cash
Answer:
The answer is: planning
Explanation:
Blueprint refers to a technical model that must be followed in order to achieve something. Setting up blueprint is really important to make sure that the restaurant's operational budget is not used for unnecessary things except the normal operation. It also consists of several steps that needed to be done in order to achieve more.
Answer:
B, Cultural congruence
Explanation:
Cultural congruence is a kind of marketing technique/strategy in which a new product with similar characteristics as with the currently existing product is marketed. This technique of marketing helps to reduce resistance as consumers see the new product as the same as the existing product.
I hope this helps.
Answer:
The answer is: 5 hours 20 minutes; 4 Trucks
Explanation:
Each truck has a 16 minute window to pick up and dump the coal. This process can be observed as an assembly line where each stage of production is the stages of coal transport. When Truck A is travelling to the dump site, Truck B can be loading the coal. When Truck B is travelling to the dump site and Truck A is dumping the coal, Truck C would be loading the coal. When Truck A is travelling to the loading area, Truck B dumping the coal and Truck C travelling to the dump site, Truck D would be loading the coal. Once Truck A gets to the loading area, Truck D would be on its way to the dump site and so on. In each 16 minute window 88 tons of coal (22 tons * 4) is picked up and dumped, that is, 22 tons every 4 minutes. Given that there are 1, 760 tons of coal, the total time taken to dump all the coal is equal to 320 minutes:
88 tons = 16 minutes (22 tons dumped every 4 minutes)
1, 760 tons = (1760 tons * 16)/88 tons = 320 minutes
320 minutes/ 60 minutes = 5 hours 20 minutes
<span>He is a quality control associate. This employee looks for the best ways to perform a task and makes sure that the company adheres to these quality control measures. The associate also makes sure that the output of the job meets up with company and regulatory standards.</span>