Answer: 11 billion billion pounds
Explanation:
Percent markup based on the selling price: 28.1%
Explanation:
The cost of the TV for the seller was

Of this, the markup of this price was 39%. Therefore, the value of the markup (in dollars) with respect to the cost for the seller was

So, this was the markup relative to the cost for the seller.
The price paid by the purchaser instead is

Therefore, the percent markup based on the selling price (paid by the purchaser) is:

Learn more about percentages:
brainly.com/question/82877
brainly.com/question/1834017
#LearnwithBrainly
Answer:
No, they wouldn't.
Explanation:
Any extra compensation to former stockholders of an acquired company which is based on post-combination share price or post-combination profits cannot be recognized as adjustments in the price of business combinations.
The reason for this is that changes in the fair value of contingent consideration (in case something happens) after the company has been acquired, e.g. achieving certain profits or stock price, are not considered period adjustments, therefore they cannot be included in the cost of the business combination (acquisition).
Answer:
D. The ability of the firm to change its plant size.
Explanation:
The long run in economics is a period of time in which all inputs in the production process can be varied. It allows firms to have the ability to change its plant size that would be more or less fixed in the short run. The factors of production used in the long run are variable inputs. Variable inputs are inputs that can be change or altered in a production system. The firm in the long run has the abilities to respond to changes in the market and demand and can build bigger factory or larger plants.
Answer:
The correct answer is project A, B and D.
Explanation:
According to the given scenario, the given data are as follows:
Low risk WACC project = 8%
Average risk WACC project = 10%
High risk WACC project = 12%
As the company always prefer the projects that exceeds the WACC projects.
So,
- Project A has 15% which exceeds the high risk WACC project.
- Project B has 12% which exceeds the average risk WACC project
- Project C has 11% which does not exceeds the high risk WACC project, hence it is not the correct answer.
- Project D has 9% which exceeds the low risk WACC project.