It would be 9 because you get half the number of projects because 18 students are partners and if you divide that you would have 9 groups of 2 and if you multiply that by the number of projects you would get the number of projects (ex:18 dividend by 2 it's 9 then if there is three projects assigned you multiply 9 by 3 to get 27 projects got it?
Steps:
1) determine the domain
2) determine the extreme limits of the function
3) determine critical points (where the derivative is zero)
4) determine the intercepts with the axis
5) do a table
6) put the data on a system of coordinates
7) graph: join the points with the best smooth curve
Solution:
1) domain
The logarithmic function is defined for positive real numbers, then you need to state x - 3 > 0
=> x > 3 <-------- domain
2) extreme limits of the function
Limit log (x - 3) when x → ∞ = ∞
Limit log (x - 3) when x → 3+ = - ∞ => the line x = 3 is a vertical asymptote
3) critical points
dy / dx = 0 => 1 / x - 3 which is never true, so there are not critical points (not relative maxima or minima)
4) determine the intercepts with the axis
x-intercept: y = 0 => log (x - 3) = 0 => x - 3 = 1 => x = 4
y-intercept: The function never intercepts the y-axis because x cannot not be 0.
5) do a table
x y = log (x - 3)
limit x → 3+ - ∞
3.000000001 log (3.000000001 -3) = -9
3.0001 log (3.0001 - 3) = - 4
3.1 log (3.1 - 3) = - 1
4 log (4 - 3) = 0
13 log (13 - 3) = 1
103 log (103 - 3) = 10
lim x → ∞ ∞
Now, with all that information you can graph the function: put the data on the coordinate system and join the points with a smooth curve.
Answer:
8:55
Step-by-step explanation:
7:30 plus 1 hour is 8:30. Quarter is 25 or 1/4. Then you add 8:30 plus 25 which gives you 8:55.
I hope this helps you
Circumference =2.pi.r
60=2.3,14.r
r=30/3,14
Arc Length = 140/360.2.3,14.30/3,14
Arc Length =70/3