1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
MissTica
2 years ago
11

I dont get this please help

Mathematics
1 answer:
Viktor [21]2 years ago
4 0

Step-by-step explanation:

the side lengths of the base (the ground triangle) are equal. that means every ground side length is 8 in.

and that also makes the 3 triangles of the side areas of the pyramid equal.

so, for the surface area of the pyramid we need to calculate the area of one side area triangle, multiply it by 3 (as we have 3 side areas) and add the area of the ground triangle.

the area of a triangle is

baseline × height / 2

so, for a side area triangle we get

8 × 14 / 2 = 8×7 = 56 in²

all 3 side areas together are then

3×56 = 168 in²

the ground area triangle is then

8 × 6.9 / 2 = 4 × 6.9 = 27.6 in²

so, the total surface area of the pyramid is

168 + 27.6 = 195.6 in²

You might be interested in
A process has an output per day of 7,040 units. the inputs to produce this are labor $1000, materials $520; and overhead $2000.
vagabundo [1.1K]
The multifactor productivity can be calculated using the the units produced and the total costs.
Units = 7040
Total costs = 1000 + 520 + 2000
Total costs = $3,520 

Multifactor productivity = 7,040 / 3,520
Multifactor productivity = 2 units per dollar
5 0
3 years ago
3.
soldi70 [24.7K]

Answer:

Step-by-step explanation:

The four sides of a square are equal.

7x + 3 = 5x + 8             Subtract 5x from both sides

7x - 5x + 3 = 8              Combine the left

2x + 3 = 8                     Subtract 3 from both sides

2x = 8-3                        Combine the right

2x = 5                           Divide by 2

x = 5/2

x = 2.5

That is not quite the answer

Side = 7x + 3

Side = 7*2.5 + 3

Side = 17.5 + 3

Side = 20.5

6 0
3 years ago
By increasing speed of car by 10km/hr the time for journey of distance 72km/hr is reduced by 36mins.find original speed of car
Eduardwww [97]

Answer:

idk

Step-by-step explanation:

3 0
3 years ago
A company that produces ribbon has found that the marginal cost of producing x yards of fancy ribbon is given by Upper C prime l
denis-greek [22]

Answer:

Step-by-step explanation:

Given:

C_{(x)}=-0.00001x^{2}-0.02x+49

for x≤1400; N = 5

So, Δx = \frac{1400-0}{5} =280\\\\\int\limits^{1400}_0 {C(x)} \, dx=∑C(a + nΔx).Δx

=C(0)Δx + C(280)Δx + C(560)Δx + C(840)Δx + C(1120)Δx

= Δx[C(0) + C(280) + C(560) + C(840) + C(1120)]

= 280[49 + 42.616 + 34.664 + 25.144 + 14.056]

=280[165.48]

=46334 approx

8 0
3 years ago
Please help asap will give brainliest if correct.
professor190 [17]

Answer:

x¹²,8x⁴,6x,2x,1

Step-by-step explanation:

x²×x⁶×x⁴=x¹²

x^4(8) =8x⁴

x^1(6) =6x

x^1(2) =2x

x^0 = 1

3 0
3 years ago
Other questions:
  • TEP 1
    13·1 answer
  • A flower bed is in the shape of a triangle, with a base of 15 feet and a height of 9 feet. What is the area of the flower bed?
    13·1 answer
  • Se escriben, cada uno en un papel, los dígitos desde el 1 al 9. Si se eligen al azar 2 papeles ¿Cual es la probabilidad de obten
    8·1 answer
  • What are the first 5 terms?
    10·2 answers
  • If Gary bikes at an average speed of 5 miles
    7·1 answer
  • Which of the following expressions represents the addition of 7² and 7³?
    15·2 answers
  • Learning Task 1: Give the value and the place value of the underlined
    6·1 answer
  • According to exponent rules, when we multiply the expressions with like bases we ________ the exponents
    10·1 answer
  • Find the equation of a line that has the same slope as y = 5 - 9x and the same y-intercept as y=-8x - 10. ​
    11·2 answers
  • Ado, Ben and Kolo are aged 12, 14 and 20
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!