Answer:
The answer is c man hope this helped
Answer:
We divided the figure into 1 triangle and 2 rectangles.
Adding up the area of them, we get the total area:
A = 14 x (10 + 8 + 12 - 16)/2 + 8 x 5 + 6 x (12 + 8)
= 258 (yd2)
Hope this helps!
:)
Answer:
correct option is d. $242.81
Step-by-step explanation:
given data
APR = 25.5% =
= 2.125
paid = $3,729
solution
we get here finance charge on the 1st month by multiplying 3,729 and now adding it to existing balance
so we get finance charge for the second and third months similarly as
APR ÷ 100 =
= 0.02125
so 1st
= $3,729 × 0.02125
= 79.25
and
$3,729 + $79.25 = $3808.24
so for next
= $3808.24 × 0.02125
= 80.93
and
$3808.24 + $80.93 = $3889.17
so for next
= $3889.17 × 0.02125
= 82.64
and
$3889.17 + $ 82.64 = $3971.81
so
finance
charge = 3971.81 - 3729
finance
charge = 242.81
so correct option is d. $242.81
Answer:
Step-by-step explanation:
The key here is knowing that the equation of the line that passes through these points is same
Thus having (6,14) and (0,0), the slope is as follows;
m = y2-y1/x2-x1 = 0-14/0-6 = -14/-6 = 7/3
Now we can use this slope here to get the value of y in the question
All we need to do is tie write the equation of the line for between the points (6,14) and (2,y)
That would be;
7/3 = y-14/1-6
7/3 = y-14/-5
cross multiply;
-35 = 3(y-14)
-35 = -3y + 42
-3y = -35-42
-3y= -77
y = -77/3
y = 77/3
Answer:
1.5 batches take 12.375 hour
Step-by-step explanation:
The first batch takes 10.5 hours, meaning only .5 batches are left. You then take the time that each new full batch takes (4.25) and divide it by 2 as you only need half of one batch. Meaning 0.5 of a batch takes 2.125 hours. You then take the time of the two batches (10.5, and 2.125) and add them, leaving you with 12.625. Meaning 12.375 is the most viable answer.