1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
USPshnik [31]
3 years ago
15

What are two possible FIRST STEPS to solve the equation below? 3(x-5)=21

Mathematics
1 answer:
igomit [66]3 years ago
4 0

Answer:

sorry i dont know

Step-by-step explanation:

but do the ones in the () first always

You might be interested in
4x+2=5x-6. I need this solved with all work shown. thank you.​
PtichkaEL [24]

Answer:

Step-by-step explanation:

4x+2=5x-6

4x-5x=-6-2

-x=-8

therefore, x=8

6 0
3 years ago
Read 2 more answers
Through which two points could a line of rotation be placed so that the base of the resulting cylinder will have a radius of 5 c
vagabundo [1.1K]

Answer:

G and H

Step-by-step explanation:

just took the test in edg.

4 0
3 years ago
Read 2 more answers
A shop sells bagels for $5 per dozen.
mylen [45]
You haven’t specified what you want us to answer, so please leave a comment and I’ll try and answer you.
5 0
2 years ago
Four more than the product of a number and seven is the product of the number and 10
zepelin [54]

Answer:

4/3

Step-by-step explanation:

7x + 4 = 10x

4 = 3x

x = 4/3

5 0
2 years ago
it takes eddie 2 hours to shovel the snow from a driveway and sidewalk. brad can shovel the snow from a driveway and sidewalk in
Arada [10]

Answer:

The time required  them working together to shovel the snow is T = 1.428 hours

Step-by-step explanation:

Given data

Time taken by first person to shovel the snow T_1 = 2 hours

Time taken by second person to shovel the snow T_2 = 5 hours

Time taken by both persons to shovel the snow

\frac{1}{T}  = \frac{T_1+T_2}{ (T_1) (T_2)}

Put all the values in above equation we get

\frac{1}{T}  = \frac{2 +5}{(2)(5)}

T = 1.428 hours

Therefore the time required  them working together to shovel the snow is T = 1.428 hours

8 0
3 years ago
Other questions:
  • 1) solve for the shaded area<br> 8 cm<br> 15 cm<br> 4 cm<br> 30 cm<br> www.analyzematlucom
    6·2 answers
  • Rewrite 0.6+(-1)-(-0.8)-0.4=0
    6·1 answer
  • If f(x)= x and g(x) = x + 6, find g(f(o)).
    13·1 answer
  • Determine the type of quadrilateral given the following coordinates. Show and explain all steps to prove your answer.
    5·2 answers
  • 9. Find the measure of angle<br> a.<br> a<br> 36°<br> 57°
    7·1 answer
  • Calculate the exact value of number one
    15·1 answer
  • Expand the expression
    15·2 answers
  • margo has 6 square tiles of equal size. each side of each tile is 0.8 inch long. if margi places all the tiles in a row with sid
    7·1 answer
  • Find the measure of side XY.
    11·1 answer
  • Which of the following best describes the graph below?
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!