Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
1)inside the triangule is 180º .There are 3 angules, one with 120º, theta and
angle ACB, lets call it x.
x + theta + 120 = 180
x + theta= 180-120
x + theta= 60
x= 60- theta
angle ACB= 60- theta
Answer:
$49.28 is the sale cost.
Step-by-step explanation:
0.35 x 75.82 = 26.537
75.82 - 26.537
= 49.283 and round