1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
viva [34]
2 years ago
5

4.6.3 Test (CST): Linear Equations

Mathematics
1 answer:
inn [45]2 years ago
5 0

The slope of the green line if the lines are perpendicular is -1/4

<h3>Perpendicular lines</h3>

For two lines two be perpendicular, the product of their slope must be -1. Let the slope of the red and green line be m1 and m2.

Given the following

Slope of red line = 4

According the definition

4m2 = -1

m2 = -1/4

Hence the slope of the green line if the lines are perpendicular is -1/4

Learn more on perpendicular lines here: brainly.com/question/1202004

#SPJ1

You might be interested in
The unknown measures of one triangle are about:
olga_2 [115]
Answer: but I need the points sorri
8 0
3 years ago
Cting Polynomials: Practice
Colt1911 [192]

The option that's true regarding the sum and difference of the polynomial p(x) and b is B. The sum and difference of p(x) and b are polynomials.

<h3>How to illustrate the information?</h3>

From the information given, it was stated that p(x) is a polynomial and is given as p(=) = a₁ + a₁ + a₂=² + ... + an.

In this case, it should be noted that the sum and difference of p(x) and b are polynomials.

They can't be integers as the function given is represented as a polynomial.

In conclusion, the correct option is B.

Learn more about polynomial on:

brainly.com/question/16340513

#SPJ1

7 0
2 years ago
The world brand of rivet placement is 11209 rivets in 9 hours and belongs to J. Mair of Ireland. If another person places 11209
Ilya [14]

Answer:

4.74 hours

Step-by-step explanation:

Given that both person have to place same number of rivets that is

11209

first person take 9 hours to complete the work

hence 1 hour work of 1st person is \frac{1}{9} of total work

second person takes 10 hours to complete the same work

hence 1 hour work of 2nd person is \frac{1}{10}

Now if both work together then

1 hour work of both person = \frac{1}{9} +\frac{1}{10} =\frac{19}{90}

thus working together they need \frac{90}{19} hours = 4.74 hours to complete the whole work which is placing 11209 rivets  

5 0
3 years ago
1. x²+2xy+y²<br>2. x²-8x+16<br>3. 16a⁴_24a²b²+9b​
ale4655 [162]

Answer:

1.(x+y)²

2. (x-4)²

3. (4a²-3b²)²

6 0
3 years ago
jack obtains a loan of $4815.16 at 2.3% ordinary interest for 42 days. what is the maturity value of the loan
il63 [147K]
The maturity value is 4827 and if needed interest value is 12.
4 0
3 years ago
Other questions:
  • The experimental probability of seeing a hawk at the again viewing center on any given day is 20%. If Jun visits the center 240
    6·1 answer
  • Can 3/10 be simplified?
    8·2 answers
  • Solve for x:<br> 3/ X - 4 = 6/ X+1
    11·1 answer
  • The dolphin dives 20 feet below the suface of the ocean. what is the elevation
    6·1 answer
  • The midpoint of a line segment with end points as (-10, y1) and (-6, 7) is (-8, 6). What is the value of y1?
    14·1 answer
  • Five friends went to Madrid. The return flight was $25 more than the outgoing flight. Airport taxes were $21 for each flight for
    11·1 answer
  • Which of these is an example of a continuous random variable?
    13·1 answer
  • A sphere has a radius r=12 inches. What is it’s approximate volume
    15·1 answer
  • Select all the common denominators for
    9·2 answers
  • -2/3f=9.2<br> -1/8n = -2/7 <br> 12/20n = -36/44<br> -64.5g = -25.8 <br> -15/28 = -9/10
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!