Answer:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
According to the situation the calculation is shown below:-
=
= 240 sq ft each member of the team in 36 minutes
=
= 6.67 sq ft each member of the team within 1 minute
= 60 sq ft for every 9 team members in one minute
=
= 70 minutes (or 1 hour and 10 minutes)
Hence, the 70 minutes is taken for 9 team members
11% = 16.5
1% = 16.5 / 11
= 1.5
100% = 1.5 * 100
= 150. His weight two years ago was 150 pounds.
Step-by-step explanation:
slope of AB = y2 -y1/x2 -x1 =14 -(-2)/1-9
= 14 +2 /1 -9
= 16/-8
= -2
slope of CD = -14 -(-10)/8 -6 = -14 +10 /2
-4/2 = -2
since slope of AB = CD
(The lines are parallel to each other)
Answer:
Step-by-step explanation:
1/3 qdbhpiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiisxbbbbbbbbb