Answer: None. The question asks about $4 per hour.
Step-by-step explanation: The cost changes by $4 every 2 hours.
That is $2 per hour.
Let x be the <span>heights of a maple tree and y be the height of the cherry tree.
We know:
</span>

<span>The new ratio is obtained like this:
</span>

.
From the above equation we get

.
then

Solving the above equation for y we get:

So
So the first tree is (400-160=240) more taller than cherry tree.
To solve this problem you have to convert the percentage to a decimal which would
be .40.
40% =40/100=.40
After doing so all you need to do is divide the amount needed by the percentage which gives you the amount she has saved.
225/.40= $90
Lauren has $90 saved
Answer:x-5
Step-by-step explanation:
THis is a cool question.
1) Use the point slope form to find the equation of the lines between two of the points (choose two points that when a line is drawn between them make a chord on the circle).
2) Use the midpoint of a line equation to find the midpoint of the line, then find the slope of the line that is perpendicular at that point and write an equation for it.
3) Then do the same thing for the other two points that form a chord on the circle.
4) Then set the two equations equal to each other and solve. The point where they meet is the circumcenter.