Answer:
Yes it is
Step-by-step explanation:
The answer is A
the answer is A
700
what i did was i divided 7000 by 10 and i got 700. then to check, i multiplied 700 by 10 and got 7000
s = hours it takes the small pipe on its own.
L = hours it takes the large pipe on its own.
we know the small pipe can do it in 11 hours total, so s = 11, so, how much of the whole job has the small done in 1 hour only?
well, if it takes 11 hours to do the whole thing, in 1 hour it has done only 1/11 of the whole job.
we know both pipes working together can do it in 6 hours flat. So in 1 hour only, both of them have done only 1/6 of the whole thing.
in that 1 hour, how much has the large one done? well, it has only done 1/L of the job.

and you can round that up as needed.
I hope this helps you
slope=y2-y1/x2-x1
slope= -3-(-4)/0-2
slope=-3+4/-2
slope= -1/2
Answer:
3.89
Step-by-step explanation:
5.42+2.25=7.67
7.67-3.78=3.89
Hope this helps