Answer:
1. 1 and 2; 2 and 3
2. 4 and 5; 5 and 6
3. 7 and 8; 8 and 9
4. 1 and 3; 2 and 4
Step-by-step explanation:
<span>
The first point is (x1,y1). The second point is (x2,y2)
Since the first point is (-1, -3), we can say (x1, y1) = (-1, -3)
So ,
Since the second point is (-4, -8), we can also say (x2, y2) = (-4, -8)
So ,
Put this all together to get: , , , and </span>
1.4 hours cause 560/400 =1.4
70,000 - 13,000 = 57,000 commission money required
sales required = 57,000 / .04 = <span><span><span>$ 1,425,000
</span>
</span>
</span>