Answer:
Letter b is correct. <em>Private-label brand</em>
Explanation:
Private-lebel brand is when products are supplied or manufactured by a particular company and then labeled with another company's brand. The advantages added to a company that decides to sell a private label product are varied, these items can increase the credibility and reliability of the company, such as increasing the sales flow and diversifying the marketed product lines.
Answer: Total cost (23500 hours predicted ) = $ 484625
Explanation:
The question is incomplete the high and low methods requires us to use high and low level of activity together with the corresponding total costs at each level to determine the variable cost per unit. we will provide assumed total costs and nursing hours in order to show how high and low method is used to predict total costs for the next period.
Assume the following were total costs and corresponding nursing hours for the previous 3 months
Total cost Hours
$560000 30000 hours
$400000 220000 hours
$225000 10000 hours
calculating Variable cost using high and low method
Variable cost per unit = (high cost - low cost)/high hour - low hours)
Variable Cost Per unit = (840000 - 225000)/ (30000 - 10000) = 16.75
Variable cost per unit = $ 16.75
Fixed costs = 560000 - (28000 x 16.75) = 560000 - 469000
Fixed costs = $91000
Total cost (23500 hours predicted ) =Total Fixed cost + Total Variable costs
Total cost (23500 hours predicted ) = $91000 + (23500 x $16.75)
Total cost (23500 hours predicted ) == $91000 + $393625
Total cost (23500 hours predicted ) = $ 484625
The advantage of a free market economy is that when it works it can both be reward and perpetuate innovation But they are inherently more risky and does tend to favor those more capital and resources . In an Economic make system with multiple equilibria coordination failure occurs when a group of firms could achieve a more desirable equilibrium but fail to because they do not coordinate their decision making
The answer is product layout. In manufacturing engineering, this talk about to a manufacture system where the work locations and apparatus are situated beside the line of production, as with assemblage lines. Generally, work units are stirred along a line (not essentially a geometric line, but a set of consistent work stations) by a conveyor.
Answer:
Purchase= 14,500 pounds
Explanation:
Giving the following information:
the total pounds needed for production in the current period is 14,000. Beginning inventory= 2,000 pounds
Desired ending inventory= 2,500 pounds
To calculate the direct material purchase, we need to use the following formula:
Purchase= direct material for the period + desired ending inventory - beginning inventory
Purchase= 14,000 + 2,500 - 2,000
Purchase= 14,500 pounds