Answer:
A.) 2x - 9x - 30 = -6
Step-by-step explanation:
hello !
to solve this system of equations, first, we substitute the equation
to the <em>y </em>variable in the equation
. Therefore, we get:

now, we simplify by multiplying -3 to the variables inside the parenthesis, which, in short, is also called the distributive property. thus, we get:

Answer:
(a) The sum of the previous term and 9
(b) 36, 45, 54
Step-by-step explanation:
Given
Sequence: Arithmetic Progression

Solving (a): Describe the relationship in each term
First, we calculate the common difference (d)
In arithmetic progression:

Take n as 2


Where



<em>The relationship is: The sum of the previous term and 9</em>
Solving (b): The next three terms
As said in (a) each term is derived from a sum of 9 and the previous term
So, we have:



Hence, the next three terms are: 36, 45 and 54
Answer:
He made seven A's.
Step-by-step explanation:
360-220=140
140/20=7
-3 is one of them hope this helps
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.