Answer:
The futures price of the C$ should be 0.82/C$.
Explanation:
Let:
rUS = Risk-free rates in the United States = 5%
rC = Risk-free rates in Canada = 3%
S = Spot exchange rate = $0.80/C$
Since the rUS is greater than rC, we have:
Future price of C$ = S + ((rUS -rC) * S) = 0.80 + ((5% - 3%) * 0.80) = 0.80 + (2% * 0.80) = 0.80 + 0.016 = 0.816, or 0.82
Therefore, the futures price of the C$ should be 0.82/C$.
<span>The relation between </span>cost<span> per unit of </span>output<span> and the </span>level<span> of </span><span>output is captured in the average total cost curve. </span><span>
When a firm is at its minimum efficient scale of operation, it produces the </span>minimum rate of output at which long-run average cost is minimized. With economies of scale, costs may fall over some ranges of output and rise over other.Correct answer: B
She added 5 instead of 4 that is your answer
Answer:
b. the fair credit reporting act
Explanation:
The "Fair Credit Reporting Act" (FCRA) is a law that was passed in<em> 1970</em> in order to control the aspect of collecting credit information of the borrower. This includes the<em> access to their credit history</em>. This act protects the borrower when it comes to the <em>privacy of his personal information.</em>
So, this act makes sure that <em>the consent of the borrower is needed </em>before one can access or check his credit history.
So, this explains the answer.
Answer:
job 429 -WIP 3040 debit
job 430 -WIP 4020 debit
job 431 -WIP 4740 debit
factory overhead 900 debit
raw materials 12,700 credit
--to record materials requisions--
job 429 -WIP 2,300 debit
job 430 -WIP 3,400 debit
job 431 -WIP 7,900 debit
factory overhead 1,310 debit
wages payables 14,910 credit
--to record wages tickets--
job 429 -WIP 1,426 debit
job 430 -WIP 2,046 debit
job 431 -WIP 4,898 debit
factory overhead 8,370 credit
--to record applied overhead--
Explanation:
job 429 -WIP: 2300 x 62% = 1,426
job 430 -WIP: 3400 x 62% = 2,046
job 431 -WIP: 7900 x 62% = 4,898
total overhead: 8,370