4,8,12,16,20,24
4x1=4
4x2=8
4x3=12
4x4=16
4x5=20
4x6=24
Answer:
-13
Step-by-step explanation:
6-7 x 6+7
-1 x 13
-13
A viable argument showing how it is reflected by the Cost Function for Wichita’s factory is; The cost of production per unit of item produced is 1$ as long as total units produced is less than 2500. If more than 2500 units are produced than the cost per unit actually comes down to 0.8$per unit.
<h3>How to Interpret Cost Functions?</h3>
From the given options, the best statement is;
The plant’s production processes are performed primarily by robots that are able to work longer hours, when needed, at no additional cost.
A cost function is a formula used to predict the cost that will be experienced at a certain activity level. Thus, the cost function for the best option is;
The cost of production per unit of item produced is 1$ as long as total units produced is less than 2500. If more than 2500 units are produced than the cost per unit actually comes down to 0.8$per unit.
The missing options are;
___ The electricity contract with the utility company is structured so that higher daily energy usage is charged at a lower rate.
___ The plant’s production processes are performed primarily by robots that are able to work longer hours, when needed, at no additional cost.
___ Overtime wages were required to produce at levels above 25,000 units.
Read more about Cost Functions at; brainly.com/question/14038368
#SPJ1
Answer:
59.08
Step-by-step explanation:
Answer:
(24, 224 ) i.e. 24 basketball and 224 footballs
Step-by-step explanation:
<em>Basketball :</em>
uses 4 ounces of foam
20 minutes of labor
profit = $2.50
<em>Football :</em>
uses 3 ounces of foam
30 minutes of labor
profit = $2
Manufacturer has :
768 ounces of foam , 120 labor hours per week,
<u>using the simplex method to determine the optimal production schedule so as to maximize profits </u>
lets assume
x = number of basketball
y = number of footballs
maximize = 2.5 x + 2y from a linear programming problem
attached below is the detailed solution