1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
avanturin [10]
1 year ago
9

A masonry contractor is preparing an estimate for building a stone wall and gate. He estimates that the job will take a

Mathematics
2 answers:
Luba_88 [7]1 year ago
4 0

Question: Hello: )✨A masonry contractor is preparing an estimate for building a stone wall and gate. He estimates that the job will take a

40-hour work week. He plans to have three laborers at $15 per hour and four masons at $25 per hour. He'll need $3268

worth of materials and wishes to make a profit of $700. Write a mathematical statement that will give the estimated cost of

the job. Then calculate this total.

Select the correct choice below and fill in the answer box to complete your choice.

Answer: Checked to see if this was right* Based on the number of hours in the work week, the cost of the laborers and masons, worth of the materials and the profit, the estimated cost of the job can be written as a mathematical statement of A. 3 x $15 x 40 + 4 x $25 x 40 + $3,268 + $700 = $

The total estimated cost is $9,768

What is the total estimated cost?

The total estimated cost of the job can be found by the formula:

= (Number of laborers needed x Cost of laborers x Number of hours in work week) + (Number of masons x cost of masons x number of hours in work week) + materials worth + Required profit

The total estimated cost is therefore:

= (3 x $15 x 40) + (4 x $25 x 40) + $3,268 + $700

= 1,800 + 4,000 + 3,268 + 700

= $9,768

Have an awesome day/night<3

Kamila [148]1 year ago
3 0

Based on the number of hours in the work week, the cost of the laborers and masons, worth of the materials and the profit, the estimated cost of the job can be written as a mathematical statement of A. 3 x $15 x 40 + 4 x $25 x 40 + $3,268 + $700 = $

The total estimated cost is $9,768

<h3>What is the total estimated cost?</h3>

The total estimated cost of the job can be found by the formula:

= (Number of laborers needed x Cost of laborers x Number of hours in work week) + (Number of masons x cost of masons x number of hours in work week) + materials worth + Required profit

The total estimated cost is therefore:

= (3 x $15 x 40) + (4 x $25 x 40) + $3,268 + $700

= 1,800 + 4,000 + 3,268 + 700

= $9,768

Find out more on total estimated cost at brainly.com/question/20950074.

#SPJ1

You might be interested in
The vertex of y=x^2+12x+32
ollegr [7]

Answer:

The vertex is y=-4

Step-by-step explanation:

The vertex is the minimum point of the graph of the quadratic equation.

Let's first find the like of symmetry.

dy/dx=2x+12

2x+12=0

2x=-12

x=-6

Now plug -6 into the quadratic equation

y=(-6)²+12(-6)+32

y=-4

7 0
2 years ago
Two sublings are 55 years combined and one sibling is 9 years younger how od is the younger sibing
Dennis_Churaev [7]

Answer:

23 years old

Step-by-step explanation:

Let x = age of younger sibling.

Then, the age of the older sibling is x + 9.

x + x + 9 = 55

2x = 46

x = 23

Answer: 23 years old

6 0
2 years ago
Read 2 more answers
Help Please! Thanks so much if u do
Sati [7]

Answer:

$65

Step-by-step explanation:

Let's add up the flat rate and the cost of four tires:

flat rate + 4($122.57/tire) = $555.28

We are to solve for "flat rate."  First, multiply out 4($122.57/tire), obtaining a tire cost of $490.28 total.  Subtracting this tire cost from the $555.28 Janette paid the shop, we get "flat rate" = $555.28 - $490.28, or $65.

Thus, the installation charge ("flat rate") must have been $65.

7 0
3 years ago
What - 31 equals to 213
Aneli [31]

Answer:

-31+224=213

Step-by-step explanation:

7 0
3 years ago
Convert to a percent.<br><br> A. <br> 53%<br> B. <br> 35%<br> C. <br> 60%<br> D. <br> 30%
adelina 88 [10]

3/5 converted to percentage gives 60%

How do we convert a fraction to a percentage?

First and foremost, the maximum percentage value any number could have is 100% , hence, in order to convert a number or fraction or even  a decimal to percentage, we simply multiply it by 100

3/5 to percent:

In order to convert 3/5 to percentage, we would multiply by 100

3/5=3/5*100

3/5 in percent=300/5

3/5 in percent=60

3/5 in percent =60%

As a result, the correct option is 60%,which is the third option, option C

Find out more about percentage on:brainly.com/question/18488471

#SPJ1

Full question:

Convert 3/5 to a percent.

A.30%

b.35%

c.53%

d.60%

7 0
1 year ago
Other questions:
  • A hole is drilled in a sheet-metal component, and then a shaft is inserted through the hole. The shaft clearance is equal to dif
    5·1 answer
  • Ali is quite the baseball player. Forty two percent of her hits are home runs if Ali hit 150 balls last season how many of those
    10·1 answer
  • What is the cost of six filters if eight cost 39.92
    5·1 answer
  • Factor x^4 -4x^3 -4x^2 +36x-45
    9·1 answer
  • Lettuce is packaged four bags to a box. If there are 3.5 boxes of lettuce in the cooler how many bags of lettuce would there be
    9·1 answer
  • The manager of a furniture factory finds that it costs $2200 to manufacture 100 chairs in one day and $4800 to produce 300 chair
    6·1 answer
  • What is the variance of the following data? If necessary, round your answer to two decimal places.12, 13, 8, 13, 9, 11, 12, 9, 1
    15·1 answer
  • What number is 40% of 720 I need work shown please show your work and don’t make it tricky thank you
    11·1 answer
  • Choose the graph of the equation y=1/3x
    8·2 answers
  • A box of stuffing costs $1.99 for 16 oz. Find the unit cost, round to the nearest hundredth.
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!