so 5 people work each one for 21 minutes, that means 21+21+21+21+21 minutes altogether, namely 105 minutes, it took that long for 7 walls, hmmmm how long for just one wall then? well, 105 ÷ 7, namely 15 minutes then, for just 1 wall.
now, if it takes 15 minutes of work to do one wall, what about 5 walls? well, that'd be 15*5 or 75 minutes.
so if we have 3 folks working, how much would each one work? well, 75 ÷ 3, namely 25 minutes, so each of them will work 25 minutes, namely 25+25+25 minutes, so in 25 minutes, they'll be done with 5 walls.
For this case we have the following vector:
v = (- 8, 2)
Using product point we have:
v.v = (-8, 2). (- 8, 2)
v ^ 2 = (-8) * (- 8) + (2) * (2)
v ^ 2 = 64 + 4
v ^ 2 = 68
v = root (68)
v = root (4 * 17)
v = 2 * root (17)
Answer:
v = 2 * root (17)
option c
Answer:
1st graph is Y=1x+0
2nd Graph is Y=-2/1x + 0
Step-by-step explanation:
Your slope is 1 for the 1st graph
Your slope is -2/1 for the second graph
Answer:
-0.4 = −2/5
Step-by-step explanation:
Rewrite the decimal number as a fraction.
-0.4/1
Multiply to remove 1 decimal places.
-0.4/1 x 10/10 =4/10
Find the GCF.
4 ÷ 2/10 ÷ 2 = 2/5
x = 2/5
-2/5