Answer:
#1, It can change and #3, it can be in an existing building to repair or remodel
Explanation:
Construction is not at a desk.
100,000? because .000157 is a decimal, right?
Answer:
Shawna needs to consult with a financial advisor to make sure she has not missed any details.
Answer:
Materials handling= $60 per requisition
Machine setups= $110 per setup
Quality inspections= $95 per inspection
Explanation:
<u>To calculate the predetermined manufacturing overhead rate we need to use the following formula:</u>
<u></u>
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Materials handling= 60,000/1,000= $60 per requisition
Machine setups= 55,000/500= $110 per setup
Quality inspections= 57,000/600= $95 per inspection