I’m timed on this I need help as well
To calculate this, we need to do the following:
92 * 115 = 10580 (we first multiply the percentage with our number)
10580 / 100 = 105.8 (and divide what we get by 100 to get the final answer)
And this is also already the answer: 105.8
Answer:
4
Step-by-step explanation:
Proportionality between skein values
8:2=4:1
Proportionality between cost values
28:7=4:1
The variation(both the skein values and cost values) has the constant of 4 ie the 1st skein value × 4= the last skein value & the 1st cost value × 4=the last cost value
Answer:
The answer is -5 1/3
Step-by-step explanation:
Answer:
Tom was speeding.
Step-by-step explanation:
The driving speed of Tom = 20.3 meters per second.
Speed allowed in the zone = 45 miles per hour zone.
Since the unit of speed allowed is given in miles per hour but the speed of tom is given in meters per second. So, first, we have to convert the meter per second into mile per hour then we can compare and find that Tom is speeding or not.
1 mile = 1609.34 meters
1 hour = 3600 second
Now convert 20.3 into mile per hour.
20.3 meters per second. = (20.3 / 1609.34)*3600 = 45.40981 mile per hour.
Since Tom’s speed is more than the allowed speed so he is speeding.