Answer:
a: solution 2 is more diluted
Explanation:
Answer:
B. finishing a sensation
Explanation: The closing phase of project management is the final phase of the project lifecycle. This is the stage where all deliverables are finalized and formally transferred, and all documentation is signed off, approved, and archived. All project management processes have been executed.
The pollen grain is actually the male gametophyte generation of seed plants. Inside the anther, pollen mother cells divide by meiosis to form pollen grains whose nuclei contain half the number of chromosomes characteristic of the parent plant.
(hope that helped answer the question)
The metric system is a system of weights and measures that was first applied in 1795 in France. Experts everywhere the world use it as the international standard to evidently communicate data. The significance are the following:
• SIMPLICITY which is the metric system is much simple than the english system because it uses a standard conversion influence for all units.
• FAMILIARITY which is almost every nation excluding the united states has accepted the metric system as its official system of weight and measures.
• UNIFORMITY which is scientists use the metric system so all experiments are conducted using the same weights and measures.
• HISTORY which is the general session on weights and measures formally chosen six metric units to be used as international standards in 1954 and in 1960 and the meter was formally distinct established on the wavelength of light from krypton atoms.
• TYPES which is the metric system use meters for space, grams for mass, liters for volume and candelas for light.
Their years fly by quicker maybe.