Answer:
tan 11 pi dived by 6 is equal to -118.307586549
Answer:
6 2/3 minutes
Step-by-step explanation:
Their rates in "jobs per hour" are ...
(60 min/h)/(15 min/job) = 4 jobs/h
and
(60 min/h)/(12 min/job) = 5 jobs/h
So, their combined rate is ...
(4 jobs/h) + (5 jobs/h) = 9 jobs/h
The time required (in minutes) is ...
(60 min/h)/(9 jobs/h) = (60/9) min = 6 2/3 min
Working together, it will take them 6 2/3 minutes.
Answer:
4
Step-by-step explanation:
You just have to divide the money he has by the ticket price.
The answer to that division is 4.5, but he can't buy half ticket, so the answer is 4
Answer:
<h2>Check out the image.</h2>
Step-by-step explanation:
Let, the equation of the straight line is y = mx + c; where m is the slope of the equation and c is the constant.
The line has the slope 1.
Hence, the equation becomes y = x + c.
Since, the line passes through (-6, -2), -2 = -6 + c or, c = 4.
Hence, the equation of the straight line becomes y = x + 4.
Putting x = 0, we get, y = 4.
The line passes through (0, 4).