Answer:
0.4
Step-by-step explanation:
so, Katherine can do 0.1 of the job per hour. (if she needs 10 hours for the job, each hour she can do the whole divided by the time, so 1/10, which is 0.1)
if in two hours she and Marina can be done, then Marina will do 1(the whole job)-2/10 (twice as much as she can do in an hour)=0.8 of the job. So if Marina does 0.8 of the job in two hours, each hour she will do half of it: 0.4 - and this is the correct answer
Yes, 90 is 1/10 of 900
Because
90 = 1/10 x 900
90 = 90
3.14 - 3a Radians
Because
180o = 3.14 radian
Answer:
45
Step-by-step explanation:
These work problems are always done in terms of fractions ie if both (Kevin & Eric) took 30mins to mow and Kevin took 1.5hrs (90mins) alone then we can make an equation like below
1/time took for both = 1/time took for Kevin + 1/time took for Eric
1/30 = 1/90+1/x ==> calling time took for Kevin x
solving the above 1/x = 1/30-1/90
1/x=2/90
x=45
Answer:
The average rate of change in that space would be 12.
Step-by-step explanation:
To find this, use the two ordered pairs (-1, 3) and (1, 27) in the slope formula.
m(slope) = (y2 - y1)/(x2 - x1)
m = (27 - 3)/(1 - -1)
m = 24/2
m = 12