1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
puteri [66]
4 years ago
9

We draw a random sample of size 25 from a normal population with variance 2.4. If the sample mean is 12.5, what is a 99% confide

nce interval for the population mean?
Mathematics
1 answer:
Helen [10]4 years ago
7 0

Answer:

<h2>11.2≤\mu12.8 </h2>

Step-by-step explanation:

Confidence interval for the population mean is expressed by the formula;

CI = xbar ± Z(S/√n) where;

xbar is the sample mean = 12.5

Z is the z score at 99% confidence = 2.576

S is the standard deviation = √variance

S = √2.4 = 1.5492

n is the sample size = 25

Substituting the given values into the formula given above,

CI = 12.5 ± 2.576(1.5492/√25)

CI = 12.5 ± 2.576(0.30984)

CI = 12.5 ± 0.7981

CI = (12.5-0.7981, 12.5+0.7981)

CI = (11.2019, 12.7981)

Hence the 99% confidence interval for the population mean is 11.2≤\mu12.8 (to 1 decimal place)

You might be interested in
Can someone graph y=x+4 i hate khan academy
Nostrana [21]

Answer:

I hope this is good enough:

5 0
3 years ago
Read 2 more answers
Q #15 Graph ARTS With vertices R(6, 6), S(3, -6),and T(0, 3) and its image. over the Y -axis
____ [38]
The rule of reflection over y-axis
(x,y) ⇒⇒⇒ (-x,y)
Note point T will not change
the solution is as shown in attached figure

8 0
4 years ago
The function c ( x ) = 63 ⋅ ( 1.03 ) x models the cost in dollars, c , of 1 ounce of a certain chemical used in a laboratory. x
nordsb [41]

9514 1404 393

Answer:

  increase

Step-by-step explanation:

Your cost function appears to be an exponential function of the form ...

  c(x) = (initial cost)·(growth factor)^x

When the growth factor (1.03) is greater than 1, it means the exponential function is increasing with x (time).

The cost function increases with time.

6 0
3 years ago
A Wheatstone quarter bridge is to be used to measure strain. The uncertainties in the supply (V_s) and output (V_o) voltages are
Ierofanga [76]

Answer:

Percentage of uncertainty=26%

Step-by-step explanation:

The solution and complete explanation for the above question and mentioned conditions is given below in the attached document.I hope my explanation will help you in understanding this particular question.

3 0
3 years ago
A customer has six (6) $1 bills, three (3) $5 bills, four (4) $10 bills, seven (7) quarters, ten (10) dimes, seven (7) nickels,
VLD [36.1K]
He would use 9 bills, and 5 coins. (fours $10, one $5, four $1. three quarters, one dime, and one penny). I calculated it all to make sure the total came out as 49.86
 
8 0
4 years ago
Read 2 more answers
Other questions:
  • Estimate the sum.<br>3,982+4,592​
    7·2 answers
  • What part of 3 1/2 is 1/2 ? PLEASE HELP ASAP! I WILL REWARD WITH BRAINIEST
    11·2 answers
  • How are the graphs of the functions y=x+7 and y=x-5 related?
    14·2 answers
  • For 50 points and possibly brainliest:<br><br>​
    15·2 answers
  • Number 15 plsss help me
    6·2 answers
  • Enter the missing digit to complete the addition statement. 71_69 + 13,458 + 14,107 + 99,234 (yes, again)
    13·2 answers
  • Find product of (5 x 10⁶) and (5 x 10⁷) ? Write your final answer in scientific notation.
    10·2 answers
  • Find the value of two numbers if their sum is 112 and their difference is 66.
    13·1 answer
  • Evaluate the function f(x)=3x+1 for f (-2/3)??
    6·2 answers
  • Can someone please help me
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!