Answer:
x = 4
Step-by-step explanation:
DO + OB = DB
15 + 3x + 7 = 9x - 2
3x + 22 = 9x - 2
3x + 24 = 9x
24 = 6x
4 = x
Answer:
d. 15
Step-by-step explanation:
Putting the values in the shift 2 function
X1 + X2 ≥ 15
where x1= 13, and x2=2
13+12≥ 15
15≥ 15
At least 15 workers must be assigned to the shift 2.
The LP model questions require that the constraints are satisfied.
The constraint for the shift 2 is that the number of workers must be equal or greater than 15
This can be solved using other constraint functions e.g
Putting X4= 0 in
X1 + X4 ≥ 12
gives
X1 ≥ 12
Now Putting the value X1 ≥ 12 in shift 2 constraint
X1 + X2 ≥ 15
12+ 2≥ 15
14 ≥ 15
this does not satisfy the condition so this is wrong.
Now from
X2 + X3 ≥ 16
Putting X3= 14
X2 + 14 ≥ 16
gives
X2 ≥ 2
Putting these in the shift 2
X1 + X2 ≥ 15
13+2 ≥ 15
15 ≥ 15
Which gives the same result as above.
45÷9=5 they can put 5 plants in each square feet.
Answer:
9.
Step-by-step explanation:
It's given that A = 16. It shows that B = A-7, so that would mean B is 16-7, which is 9.
Answer: 3 inches, the triangles are the same
60 degrees, the triangles ae the same
Step-by-step explanation: